Charged Fleet Logo

Greenlane Lands $15M Grant, Breaks Ground on Charging Site

Greenlane was awarded a $15 million grant by South Coast Air Quality Management District to accelerate commercial EV charging infrastructure and recently broke ground on an EV charging site in Colton, California, that will have more than 60 chargers.

A solar-powered parking lot featuring solar panels on canopies, providing shade and renewable energy for vehicles.

The charging site, which is anticipated to be commissioned at the end of 2024, will feature more than 60 chargers for heavy-, medium- and light-duty zero-emission vehicles.

Photo: Greenlane

3 min to read


As the demand for zero-emission medium- and heavy-duty commercial vehicle refueling infrastructure accelerates at state and federal levels, Greenlane has secured a $15 million grant from the South Coast Air Quality Management District (SCAQMD) under the Carl Moyer Zero-Emission Infrastructure Program.

The grant will allow Greenlane, a joint venture between Daimler Truck North America, NextEra Energy Resources, and BlackRock through a fund managed by its Climate Infrastructure business, to accelerate the development of its first commercial EV charging corridor along Interstate 15.

Ad Loading...

The project, located at the intersection of major Interstates 215 and 10 in California, will begin construction at the company’s flagship charging site in Colton, where representatives from Greenlane, the City of Colton, and SCAQMD held a groundbreaking event.

More Than 60 Chargers for Zero-Emission Vehicles

At full build, the site is planned to include more than 60 chargers for heavy-, medium- and light-duty zero-emission vehicles (ZEVs).

Of those chargers, 41 charging pedestals and 53 connectors are funded by the grant from the SCAQMD. The site is set to serve as a model for the truck stop of the future as the nation continues to electrify freight transportation.

“Greenlane is clearly defining a path towards a more sustainable future not only for the transportation industry but also for residents living in San Bernardino County, who are subject to higher levels of air pollution,” said Larry McCallon, South Coast AQMD governing board member and mayor pro tem for the City of Highland. “Freight transportation from the goods movement corridor has been a major source of air pollution in our region, and this project will help improve air quality and bring us one step closer to meeting federal standards.”

A modern EV charging station rendering showcasing sleek architecture.

Greenlane recently broke ground to start construction.

Photo: Greenlane

Grant Funds Will Provide Infrastructure Design & Build-Out

South Coast AQMD’s grant funds allocated for the Colton site will be utilized for site design and engineering and charging infrastructure build-out, expediting development timelines to facilitate the commissioning of the Colton site by the end of 2024.

Ad Loading...

“We are excited that Greenlane identified Colton as the company’s first charging site in a project that not only marks a significant step in improving air quality in our community and the region, but that brings vital infrastructure to an important industry,” said City of Colton Mayor Frank J. Navarro.

Meeting Strategic Objectives to Reduce Emissions

Greenlane's success in securing the $15 million grant is a testament to the company's innovative approach to development operations and its commitment to meeting SCAQMD's strategic objectives in reducing emissions in critical areas, including the potential public health benefits of reducing pollution in the Colton area. Strong collaboration with Greenlane's joint venture partners and the City of Colton will enable Greenlane to pave the way for site construction quickly.

“We are grateful to the South Coast Air Quality Management District for recognizing and championing our visionary plans to develop this critical infrastructure that will revolutionize and energize the trucking industry,” said Greenlane CEO Patrick Macdonald-King. “By establishing corridors and deploying a nationwide network of public charging stations, we're not only meeting the pressing demand for accessible infrastructure for commercial vehicles but also pioneering a transformative model for the future of commercial EV charging and, eventually, hydrogen refueling.”

Plans to Develop Nationwide Charging Infrastructure

Greenlane said it aims to develop a nationwide network of commercial charging infrastructure locations across the U.S. and Canada. The charging sites will also serve battery-electric passenger car and light-duty fleet customers and are designed to provide hydrogen refueling for commercial vehicles in the coming years.

Greenlane Infrastructure Plan: EV Charging & Hydrogen Fueling

Greenlane's mission is to design, develop, install, and operate a nationwide, high-performance, zero-emission public charging and hydrogen refueling network for medium- and heavy-duty battery-electric and hydrogen fuel-cell commercial vehicles.

Ad Loading...

Greenlane said it addresses the urgent need for publicly available, nationwide electric charging infrastructure for commercial vehicles, especially for long-haul freight operations, and is a critical step toward the development of a sustainable zero-emission vehicle ecosystem across North America.

Originally posted on Work Truck Online

More Charging

A California state outline with a Charged Fleet logo on the bottom left,
Charging•by News/Media Release•October 16, 2026

California Opens $28 Million in EV Fast-Charging Incentives

The Fast Charge California Project offers up to $100,000 per charging port for eligible, ready-to-build public charging projects, with applications open through Jan. 14, 2027.

Read More →
A transparent background of a wireless EV charger with black text over it in the center and the Charged Fleet logo in the top left
Charging•by News/Media Release•October 7, 2026

Honda Develops In-Motion Wireless EV Charging Technology for Commercial Vehicles

Honda, Taisei and Taisei Rotec are developing a road-embedded wireless charging system capable of transferring up to 150 kW, with public-road testing planned in Japan beginning in fiscal 2027.

Read More →
An Arnold Clark black building with an electric charger out front
Charging•by News/Media Release•September 30, 2026

Arnold Clark Charge Opens Six Ultra-Rapid EV Chargers in Huddersfield

The new public charging site brings the Arnold Clark Charge network to 63 locations across the U.K., with charging priced at 55 pence per kWh.

Read More →
Ad Loading...
A thumbnail for the 2026 annual reliability report from ChargerHelp
Charging•by News/Media Release•September 25, 2026

ChargerHelp Report Finds EV Charger Recovery Delays Can Stretch Beyond a Month

An analysis of approximately 500 million data points found charging issues requiring multiple work orders took a median of 32 days to resolve, highlighting the operational impact of diagnostics and repair coordination.

Read More →
Xos charger hub standalone
Charging•September 9, 2026

Xos Mobile Charging Hub Surpasses 1 GWh of Energy Delivered

As fleets electrify, charging capacity does not always arrive on the same timeline as the vehicles. Operating data from one Xos Hub shows how mobile, grid-independent charging can support vehicles when permanent infrastructure or utility upgrades aren't available.

Read More →
A black rental car is at a ChargePoint stations
Charging•by News/Media Release•August 28, 2026

ChargePoint Adds Overhead EV Fast Charging at Portland International Airport

The installation can charge up to 20 rental vehicles simultaneously and uses overhead equipment to preserve ground-level space at the airport's Quick Turnaround Facility.

Read More →
Ad Loading...
A blue car and a pink octopus sit next to each other on a graphic for Octopus Charging
Charging•by News/Media Release•August 27, 2026

Octopus Energy Launches Public EV Charging App in U.S.

Octopus Charge allows EV drivers to locate and access public charging stations through a single app, building on the company's Electroverse platform in Europe.

Read More →
A green graphic for a level 2 Schneider Charge
Charging•by News/Media Release•August 26, 2026

Schneider Electric Launches Level 2 Home EV Charger With Integrated Load Management

Schneider Charge uses integrated SmartAmp technology to adjust charging output based on household electrical demand and is available with NACS or J1772 connectors.

Read More →
Charged Fleet Off-Peak thumbnail showing a man beside an EV charger with green lightning and the text “Charger Reliability v. Gas Pump Ease.”
Charging•by Staff•August 5, 2026

Why EV Charging Reliability Is More Complicated Than It Looks

GridLink CEO Josh Silets explains what causes EV chargers to fail, why fleet operators often struggle to identify the source, and what questions they should ask charging vendors.

Read More →
Ad Loading...
a hand holding a phone with the MyChevrolet Energy Pass chargin app open
Charging•by News/Media Release•July 28, 2026

GM Adds ChargePoint Network to Energy Pass Platform

The integration gives GM EV drivers access to additional DC fast chargers and Level 2 stations through a single app while expanding the automaker's public charging ecosystem.

Read More →