Charged Fleet Logo

Cadillac Unveils 2025 Escalade IQ

The all-electric full-size SUV from Cadillac boasts a Cadillac-estimated 450 miles of range.

Cadillac Unveils 2025 Escalade IQ

Front view of Cadillac ESCALADE IQ Sport in Flare Metallic with shield-shaped grille in view.

Photo: Cadillac

3 min to read


Cadillac unveiled the all-electric 2025 Escalade IQ, offering a Cadillac-estimated 450 miles of range. 

The Escalade IQ features a curved pillar-to-pillar 55-inch total diagonal LED display, available Super Cruise driver assistance technology, vehicle-to-home bidirectional charging technology with GM Energy’s available Ultium Home products, and zero tailpipe emissions.

Ad Loading...

“Escalade IQ raises the standard just as the original Escalade redefined luxury a quarter-century ago,” said John Roth, vice president, Global Cadillac. “This reimagining of an icon marks the next step in Cadillac’s all-electric future.”

2025 Escalade IQ Features

The Escalade IQ features independent front and rear suspension, with power transferred to 24-inch wheels with 35-inch tires via front and rear drive motors that work in conjunction as an eAWD system.

Additional advanced technologies include Magnetic Ride Control 4.0 and Adaptive Air Ride Suspension.

The Adaptive Air Ride Suspension system enables the vehicle to be lowered up to two inches (50 mm) and raised one inch (25 mm), while additional features such as the standard Four-Wheel Steer, available Cadillac Arrival Mode, and Low Ride Mode enhance capability.

Four-Wheel Steer reduces the turning diameter to only 39.4 feet (12 meters) at lower speeds and reduces the turning diameter by more than 6.5 feet for greater maneuverability in parking lots and a tighter overall turning radius.

Ad Loading...

Cadillac Arrival Mode is a Four-Wheel Steer feature that allows the Escalade IQ to move diagonally.

Low Ride Mode enables the Escalade IQ to be driven at low speeds with the suspension fully lowered.

A 24-module Ultium battery serves as the foundation of the Escalade IQ, producing more than 200 kWh of available energy. It also employs a high-voltage architecture that enables 800-volt DC fast charging, providing up to 100 miles of range in 10 minutes of charge time.

Escalade IQ will be equipped with Vehicle-to-Home (V2H) bidirectional charging technology with GM Energy’s available Ultium Home products.

Safety Features of 2025 Escalade IQ

Escalade IQ also features a suite of standard active safety and driver assistance features, including:

Ad Loading...
  • Blind Zone Steering Assist: Can provide a brief, firm turn of the steering wheel when a potential crash is detected with a moving vehicle in the lane the vehicle is entering

  • Intersection Automatic Emergency Braking: Can help drivers avoid or reduce the severity of an intersection collision with a detected cross-traffic vehicle

  • HD Surround Vision: Provides selectable digital camera views of the area around the vehicle and can help drivers park or avoid vehicles and objects

  • Enhanced Automatic Parking Assist: Can automatically steer, brake, and shift gears to park the vehicle into a dedicated parallel or perpendicular parking space and can help unpark the vehicle

  • Front Pedestrian and Bicyclist Braking: At speeds between five and 50 mph, can help drivers avoid or reduce the severity of a collision with a pedestrian or bicyclist it detects directly in front of them

“Escalade has always been about being bold, so that’s what we set out to accomplish,” said Mandi Damman, chief engineer, Escalade IQ. “Escalade IQ is what you get when you follow your soul instead of the crowd.”

Built at Factory ZERO

Regular production of the Escalade IQ begins next summer at GM’s Factory ZERO Detroit-Hamtramck Assembly Center in Michigan, with domestic and globally sourced components.

Factory ZERO was renovated and retooled with a $2.2 billion investment to serve as the launchpad for GM’s EV strategy.

Pricing starts at around $130,000 including destination charges.

More Electric Vehicles

A Charged Fleet graphic with a transparent rear-view background of a chargin Tesla
Electric Vehiclesby Faith HowellSeptember 16, 2026

EV Charging Use Is Outpacing Infrastructure Growth

ChargePoint’s 2026 Charging Forward Report points to rising charger use, higher-powered charging, commercial vehicle electrification, and energy-management technology. Here’s what fleets should know.

Read More →
Mark Holland headshot for 2026 leadership update
Electric Vehiclesby News/Media ReleaseSeptember 10, 2026

EV Realty Names Henrik Holland President as Charging Platform Expands

The former Prologis Mobility and Shell executive will help expand EV Realty’s truck charging business and move its power-first infrastructure model into autonomous vehicle depots and other fleet sectors.

Read More →
Three GreenPower Type A Nano BEAST electric school buses.
Electric Vehiclesby Elora HaynesSeptember 9, 2026

GreenPower Expands New Mexico EV Pilot With Larger Buses, V2G Testing

After logging more than 17,000 electric miles in the first year, New Mexico’s statewide pilot is moving into its second phase with larger vehicles, continued charging evaluations, and more.

Read More →
Ad Loading...
A black, white, and yellow Charged Fleet podcast logo with text over top
Electric VehiclesSeptember 4, 2026

Can EV-as-a-Service Help Fleets Scale Electrification?

Sustainability Partners CEO Adam Cain explains how matching EVs, charging infrastructure, and duty cycles can help fleets scale electrification.

Read More →
Illustration of an electric fleet vehicle connected to a charging station with the text “Electric Vehicles... As a Service?”
Electric VehiclesSeptember 1, 2026

How EV-as-a-Service Is Moving Fleets Beyond Pilots

Adam Cain, president and CEO of Sustainability Partners, explains how EV-as-a-service can help fleets scale deployments by addressing duty-cycle requirements and charging challenges. 

Read More →
A Charged Fleet and mobility powerhouse acquisition
Electric Vehiclesby Amanda HuggettAugust 20, 2026

PowerFlex, The Mobility House Join Forces to Advance Fleet Electrification

Two EV charging providers are joining forces to deliver a broader portfolio of energy management and fleet electrification solutions.

Read More →
Ad Loading...
Ford Fathom on track facility
Electric Vehiclesby StaffAugust 18, 2026

Ford Retools Louisville Plant for Fathom Electric Truck Production

Ford's $2 billion Louisville Assembly Plant overhaul introduces a three-part assembly process for the Fathom midsize electric truck, with production scheduled to begin in 2027.

Read More →
green car with text over it reading The Current State of Fleet Electrification
Electric VehiclesAugust 13, 2026

Merchants Fleet Reports 290M EV Miles as Fleets Navigate Changing Electrification Market

From millions in operating savings to hundreds of millions of EV miles, Merchants Fleet’s latest report reveals what’s working and what’s changing in fleet electrification.

Read More →
Three speakers participate in a panel discussion at the Road to 2028 Summit Series. A man in a gray suit speaks into a microphone while two other panelists listen on stage beneath a "Road to 2028 Summit Series" sign.
Electric VehiclesAugust 12, 2026

California District Commits to Electrify 25% of School Bus Fleet by 2028

One of the nation's largest school bus electrification projects to date demonstrates how grants, charging infrastructure, and public-private partnerships can help fleets transition to EVs at scale.

Read More →
Ad Loading...
Futuristic silver three-wheeled Aptera solar electric vehicle drives along a palm-lined road, featuring integrated solar panels, aerodynamic bodywork, enclosed front wheels, and a streamlined teardrop-shaped cabin.
Electric Vehiclesby News/Media ReleaseAugust 10, 2026

Aptera Orders Bodies and Chassis for Its First 40 Production Vehicles

Aptera Motors Corp. has issued purchase orders for the major structural components of its first 40 vehicles, and body and chassis components are expected to begin arriving in October.

Read More →