The telescoping grappling saw allows contractors to take trees down at a faster pace than traditional tree removal processes.
Feasibility study finds tunnel could improve rail connection between San Diego-L.A.
Realigning the LOSSAN line by constructing a tunnel would shorten the rail route between the two cities by approximately three miles and reduce travel time by six to seven minutes.