
Starting in 1964 for as an event for Illinois Bell, The Utility Expo has been rebranded and is ready to go in 2021.
Read More →
The company published an update on factor preparations and introduced the first three members of its board of directors.
Read More →The EV Star comes with a standard J1772 high power Level 2 and CCS DC fast combo charge system, allowing for optimal flexibility in route planning for any duty cycle.
Read More →
A single charge gives the eCanter an operating range of approximately 100 km, which is ample for many urban delivery applications.
Read More →
The van would reportedly start production in late 2021 and be powered by GM’s new proprietary Ultium batteries.
Read More →
BYD implemented stringent safety protocols and begun a phased reopening of its Lancaster Coach and Bus manufacturing plant.
Read More →
This tool shows that outside temperature can cut an EV range by close to half in some models.
Read More →
Octillion Power Systems is collaborating with Lightning Systems to produce Class 6 electric trucks (up to 12.5 tons) capable of supporting “middle-mile” delivery logistics between warehouses and distribution centers.
Read More →
The Oberlin City Council's plan with Sway Mobility of Shaker Heights would supply two electric vehicles, either Nissan Leafs or Chevy Bolts, a charging station, insurance, and maintenance.
Read More →
As the start of hurricane season approaches, Duke Energy is preparing to respond to power outages as quickly as possible – while adapting to the challenges of protecting the well-being of the company's employees, customers, and communities during the COVID-19 pandemic.
Read More →